ACT [Advanced Cultural Technologies] Cinemage
- 150-01-H-05
- Dossiê
- 2000 - 2003
ACT [Advanced Cultural Technologies] Cinemage
Renewal IT Project Manager [job description]
Includes records related to the Building Stream of the Renewal Project (MRP). The purpose of this stream was to expand and enhance the existing MOA built space, with the following specific objectives:
• To build a new research centre comprised of four Research Suite including laboratory spaces, individual and group work spaces, and office spaces.
• To construct new storage space, including visible and compacting storage, to house MOA’s and the Laboratory of Archaeology’s (LOA) collections
• To respect the building and its exterior as a significant architectural heritage site in the renovations plans
• To create spaces where community members may gather and attend to collection objects in ways that respect their cultural traditions
• To improve the Museum’s financial viability by expanding revenue generating facilities such as the retail store, and by making its building operations more efficient
• To create enhanced Visitor Services for Museum users, such welcoming and warm arrival spaces which ate self-orienting and which provide all needed amenities
• To create efficient and supportive work spaces for staff, students, researchers, and volunteers
• To provide a welcoming and comfortable environment for all researchers using MOA’s facilities
• To provide enhanced teaching support within the new facilities
(the purpose and objectives of the Building stream taken from the MRP Program Scope Definition, 1.2.)
Jill Baird and William McLennan were the Building stream leads.
The series is divided into subseries based on the various functions of the Building stream.
Building [equipment list, security requirements during construction, notes]
Michael Lundholm [correspondence]
Includes correspondence with Michael Lundholm (architect). Also includes a draft "Study of Museum Space Needs and Development Options" from 1998, made by Lundholm.
Architects - Stantec (formerly Architectura) 2003
Includes meeting notes and information about Stantec.
Correspondence from Lundholm, 2002-2003
includes correspondence regarding work to be done after completion of feasibility study.
Concept Design Estimate, Hanscomb, December 2001
Research Centre - Project scopes and schedules
Research centre and visible storage
Space requirements and revised Functional Programme, June 2005
MOA Project Transition [draft document]
Supply management [UBC policies, contracts, correspondence]
Includes draft contracts with vendors/consultants for furniture, database support, graphic design. Also includes memos and other documentation of UBC policies around equipment and supply management within UBC departments. Correspondence participants include MOA management, Don Graham (in role as Director, Supply Management), Metaform Communication Design, Annex Consulting Group, Friesen Design Group, and Lyle Wilson.
Museum operations during renewal