[The crew takes a break]
[Covered log with long house in background]
[Chip and Ron discuss]
[Chip and Ron discuss]
[Chip measures length of bow]
[Chip and Isaac attach posts]
[Chip and Isaac attach posts]
[Chip and Isaac situate posts at middle of canoe log]
[MOA grounds with covered canoe log in distance]
[Chip explains work in progress to crowd]
[Isaac adjusts post at east end of log]
[Canoe log with posts attached]
[View of canoe log and totem poles]
[Chip, Ron and Isaac measure posts]
[Chip and Isaac discuss measurements]
[Chip and Isaac discuss measurements]
[Model canoe on top of log]
[Canoe progress]
[Isaac inspects model canoe]
[Isaac inspects model canoe]