[Chip and Isaac continue shaping]
[Canoe log with posts attached]
[Isaac, Chip and Ron shape west end of log]
[Ron shapes west end of log]
[Ron shapes west end of log]
[Chip shapes west end of log]
[Ron and Chip measure end of log]
[Ron, Isaac and Chip measure west end of log]
[Ron, Isaac and Chip measure end of log]
[Ron shapes west end of log]
[Isaac shapes east end of log]
[Isaac shapes east end of log]
[Ron and Isaac attach posts to east end of log]
[Chip, Isaac and Ron attach posts to east end of log]
[Isaac climbs to top of log]
[Chip, Isaac and Ron prepare to attach posts to middle of log]
[Ron inspects bark]
[Chip and Isaac measure east end of log]
[Documenting work in progress]
[Ron and Isaac assess]